DNV Verifies 99 Percent Performance Availability for Fluence Energy Storage Fleet
Independent energy consultant DNV has verified that Fluence Energy’s large-scale energy storage fleet maintains a 99% performance availability rate. This validation confirms the operational uptime of the company’s utility-scale battery systems, providing a third-party assessment of the technology’s reliability in the field.
The assessment analyzed data from Fluence’s global fleet of energy storage projects to determine how often these systems remain available to provide power to the grid. By achieving this 99% availability metric, the report quantifies the consistency of the company’s hardware and software integration. This verification process serves as a technical audit of the fleet’s performance, offering stakeholders and grid operators data regarding the operational stability of these large-scale storage assets.
Newsflash | Powered by GeneOnline AI
Source: GO-AI-ne1
For any suggestion and feedback, please contact us.
Date: June 9, 2026
©www.geneonline.com All rights reserved. Collaborate with us: [email protected]





